Shakhty (all over the city)

22.03.2021
511
  • Existing outdoor lighting fixtures were replaced with LED energy-saving luminaires of different power on city roads, internal development roads, park areas of Novorossiysk. Total number of fixtures installed: 15,292.

  • Automated outdoor lighting, metering device, and auxiliary equipment control boxes were installed, without establishing new electric power metering points. Total number of boxes installed: 257.

  • Energy saving achieved: over 62%.

  • project time: 9 months.

Город после выполненных работ

Click to call