1. Главная
  2. Проекты
  3. Outdoor Lighting
  4. Kamensk-Shakhtinsky (all over the city)

Kamensk-Shakhtinsky (all over the city)

22.03.2021
333
    • Existing outdoor lighting fixtures were replaced with LED energy-saving luminaires of different power on city roads, internal development roads, park areas of Kamensk-Shakhtinsky. Total number of fixtures installed: 4,151.

    • Automated outdoor lighting, metering device, and auxiliary equipment control boxes were installed, without establishing new electric power metering points. Total number of boxes installed: 63.

    • Energy saving achieved: over 60%.

    • project time: 4 months.



      Click to call